ExxonMobil picks Sinopec Engineering for construction of multi-billion cracker project in China

ExxonMobil picks Sinopec Engineering for construction of multi-billion cracker project in China
WESPECH PTE LTD
8 Eu Tong Sen Street #14-94, The Central, Singapore (059818)
+65 315 904 24

20.04.2021

MOSCOW (MRC) --В Sinopec Engineering (Group) and ExxonMobil (Huizhou) Chemical (EMHCC) haveВ entered into a BEPC (basic design, engineering, procurement and construction) contract for the proposed Huizhou Chemical Complex Project (Phase I), according to Indian Chemical News. Under the contract, the Group will provide EMHCC with BEPC services for the project. The main scope of the services

Full article at mrcplast.com

Back

news